OVERSIGHT
The AI-Native Owner's Representative.
The Operating System of Construction.
NOT JUST BY A FEW POINTS
Megaprojects run past budget by more than 30 percent.
… and 20 months late.
McKinsey & CompanyThe Construction Productivity Imperative: Decade Review. July 2025.
What 20 Months Late Looks Like.
Oversight is the new
Operating System of Construction.
Complete visibility.
Schedule
On time. Every slip found the week it starts.
Budget
On budget. Every draw paid against the work the scan verified.
Quality
Up to spec. Every install held to ± 2 mm before it is buried.
On demand.
That is the difference.
Reporting the past.
Controlling the future.
From chaos to control.
Dozens of consultants and hundreds of emails: Oversight separates the signal from the noise.
The entire development lifecycle.
- 01Ensight
- 02Foresight
- 03Oversight
- 04Closeout
- 05Operate
- 06Analytics
THE ENTIRE DEVELOPMENT LIFECYCLE · ONE TAKE
From concept to closeout.
Ensight
Before land acquisition: the market and the site, read as one.
Foresight
Before ground breaks: the design, tested against code.
Oversight
While it is built: scanned weekly against the model.
Closeout
At handover: ready for service on the date.
Operate
While it is owned: performance, measured in real time.
Analytics
Across the portfolio: root cause, and what comes next.

01 · ENSIGHT
Before land acquisition: the market and the site, read as one.
Ensight is the insight before the site. Before the land is bought, market intelligence meets a physical scan of the parcel, so feasibility is known in an instant and the deal is priced on the market it will serve.
- Market intelligence: demographics, trends, cannibalization
- A physical scan of the site
- Feasibility in an instant

02 · FORESIGHT
Before ground breaks: the design, tested against code.
Before ground is broken, every design option is tested against zoning, code, height limits and setbacks until one is the highest and best fit.
- Design coordination
- Design options tested against zoning and code
- Height limits and setbacks, highest and best fit

03 · OVERSIGHT
While it is built: scanned weekly against the model.
During construction, weekly LiDAR scans compare installed work to the 3D BIM model, so schedule, budget and quality are verified on install, not invoice.
- Weekly LiDAR scans
- Scan against the original 3D model
- Schedule, budget and quality, on demand

04 · CLOSEOUT
At handover: ready for service on the date.
At handover, the building is ready for service on the promised date, with the certificate of occupancy in hand and every as-built and commissioning record on file.
- Ready for service on the date
- Certificate of occupancy in hand
- As-builts and commissioning on record

05 · OPERATE
While it is owned: performance, measured in real time.
While it is owned, the asset is managed across every CRE segment, with live reads on lease-up, NOI and power use.
- Asset management across CRE segments
- Lease-up, NOI and power use, tracked
- The as-built record, carried into operations

06 · ANALYTICS
Across the portfolio: root cause, and what comes next.
Across the portfolio, one traceable record runs from the supply chain to the owner, so every root cause is documented and the next project is forecast from it.
- Supply chain to owner, operator and developer
- Traceable, documented root cause
- Predictive analytics, in context
TEST FIT
Pick a Parcel. Pick a Program. Run the Fit.
Choose a site and a program. The Envision OS Testfit Engine returns what the parcel holds.
Site
- Parcel
- 320 × 210 ft
- SetbacksFront, side, rear
- 10/5/5 ft
- Density cap
- 110 du/ac
- Parking min
- 1.5 per unit
- Buildable envelope
- 1.42 ac
Program
Levers
FLOORS ON THE PODIUM
The engine is modelled to 5-over-2. Eight and twelve floors show massing and yield; construction type is not checked above five.
PARKING PER UNIT
ZONING
Max fit lifts the zoning gates. Parking, fire access and fit still bind.
SITE AHIGH-RISEFLOORS 8PARKING 1.5 BY RIGHT
UNIFIED API
One unified API for all the software you already run.
A job's records live in systems like these: 21 of them, in 7 categories. Oversight connects them into one shared record, starting with Procore, Sage Intacct, Autodesk and Rabbet. Nobody types the same number twice.
Through one Oversight API, the 21 systems a team already runs (Yardi, MRI Software, RealPage, ARGUS Enterprise, Juniper Square, Dealpath, Procore, Autodesk Construction Cloud, Oracle Aconex, Sage Intacct, Sage 300 CRE, Trimble Viewpoint Vista, Oracle Primavera P6, Microsoft Project, Smartsheet, Rabbet, Oracle Textura, GCPay, CoStar, CoreLogic, ATTOM Data) feed one project record, handed back in five layers: data (scan_week_26.json, job_cost.json, draws.json); context (timeline.json, cost_codes.json); ontology (directives.json); decision (critical_path.json, variance_log.json); predictive (market_intel.json).
THE FIVE LAYERS
What happens to your data once it's in.
Every record from every system climbs the same five layers, from a raw export to a forecast you can act on.
LAYER 01
Data
Field capture. What the scans, the systems and the site actually recorded.
LAYER 02
Context
When it happened, placed on the project timeline.
LAYER 03
Ontology
Who said what, when, and their authority to set direction.
LAYER 04
Decision
The construction critical path, adjusted by AI as the record changes.
LAYER 05
Predictive
Market intelligence: supply chain, sentiment and macroeconomics, read early to warn before risk becomes cost.
We Don't Ask for Progress Reports. We Generate Them.
PORTFOLIO/FUND III
OVERSIGHT
Westside Tower III
field execution · cost · quality · safety
Project summary
Level 7 of Westside Tower III measures 59.5% complete at scan week 26, against 75% billed on pay application 14. Weekly LiDAR registered at 14:31; two RFIs are overdue.
CONCEPT PROJECT · SCAN WEEK 26
- MEASURED
- 59.5%
- Level 7 · week 26
- BILLED
- 75%
- L7 · pay app 14
- GAP
- 15.5 pts
- draw held
- OPEN RFIS
- 9
- 2 overdue
ontology synced 14:317 signals routed today

Site evidence
- TEMP
- 71°F
- WIND
- 8 mph NE
- PRECIP
- 0%
- In tolerance
- Not installed
- Installed wrong
- Offsets drawn ×7
Column C-4 / L7: 2.4 in out of plumb
- BLOCK
- B
- LEVEL
- L7
- GRID REF
- C-4
- STATIONS
- 15
The pay application claims 75% complete. The LiDAR scan · week 26 measured 59.5% complete. 15.5 points were billed but are not in place. Draw held.
Pay app 14 said Level 7 was 75% done. The scan found 59.5%.
Every line of the contractor's application is checked against the weekly scan before any money moves.
Application for payment
Continuation sheet- Work completed to date, as billed75%
- Work in place, measured by the scan59.5%
- Billed, not in place15.5pts
- Current payment due15.5 percentage points were billed for work that is not in place. The draw stays held until it is.
| AItem | BDescription of Work | CScheduled Value | DCompleted to Date | EIn Place, Measured | FBilled, Not in Place |
|---|---|---|---|---|---|
| 1 | Structure | 30% | 100% | 95% | 1.5 |
| 2 | Envelope | 20% | 80% | 55% | 5 |
| 3 | MEP rough-in | 25% | 70% | 50% | 5 |
| 4 | Interiors | 15% | 30% | 10% | 3 |
| 5 | Fire protection | 10% | 70% | 60% | 1 |
| Totals | 100% | 75% | 59.5% | 15.5 |
Just Proof.
Software was always built for the builders. Oversight was designed for those who actually cut the checks.
| Who Watches the Build | Today's owner's repThe monthly report | Turner & TownsendHill InternationalAECOMThe consultant | ProcoreAutodesk Construction CloudThe dashboard | OpenSpaceBuildotsDroneDeployThe site camera | OversightANSWERS TO YOUNo scan, no draw. |
|---|---|---|---|---|---|
| What it hands you | A retyped report | A rolled-up report | What the team typed in | Here is what got built | The answer, from a weekly scan |
| Looks at the build | Once a month | Once a month | As it is typed in | Photos, most days | Every week, by laser scan |
| Measures what was built? | No | No | No | PartlySees it, not to a tolerance | Yes |
| Ties the work to the contract, change order and waiver? | PartlyBy hand, monthly | PartlyBy hand, monthly | PartlyHolds them, you link them | NoSees the work, not the paper | One closed loop |
| Checks the pay application | Signs it | Reviews it | Stores it | No | Line by line, against the scan |
| Says what happens next? | PartlyA month later | PartlyA month later | NoRecords it, you decide | NoReports progress, stops there | Yes |
| Answers to you, the owner? | Yes | Yes | NoWorks for the builder | NoWorks for the builder | Yes |
| Paid by | You | You | The builder | The builder | You |
| Apply to Deploy |
VERTICALS
AI's bottleneck is no longer chips. It's concrete.
The same weekly scan on a data hall, a reactor island and a bridge.
Every data hall, measured every week.
Ready for power on the date you promised.Every pour checked before the next one starts.
Grid. Nuclear. SMR.Every draw matched to work in place.
An independent record of every public dollar.Running on these projects now.
Active contracts. We name them in the briefing.
Mixed-use corporate center
Industrial logistics campus
Corporate center: the window study
Corporate center: the site, rendered
ALSO ACTIVEMASTER-PLANNED RESORT COMMUNITYSOUTH FLORIDA · $1.2B












